.webp)
-859330.jpg)
COLOMBO ( News 1st) - The National System Operator (Pvt) Limited says power distribution through the island’s electricity transmission grid substations has been fully restored.
It stated that an island-wide power outage occurred at around 11:40 AM today.
The National System Operator (Pvt) Limited added that the exact cause of the outage has not yet been confirmed.
